Civil domains · Planned module
Buildings & utilities
Coordinate the building layout with the services that pass through it. The planned workflow follows fixtures, risers and connections across architectural and utility drawings.
Example workflow
Coordinating a plumbing riser
An architectural plan shows a service shaft beside a stair. A plumbing drawing places a riser in the same area. The coordination question is whether both disciplines are working from the same location and revision.
Floor plan
Locate the shaft by floor, room and structural grid. Record the drawing revision.
Services layout
Find the corresponding riser and trace its route through the floor. Compare its position with the shaft outline.
Coordination note
Identify the two views and describe the discrepancy for the architect and services engineer to resolve.